16-year professional manufacturer ISO triple certification National direct shipping VOC<50g/L eco-friendly water-based coating
24-hour technical hotline: 0550-7647288

Project cases

6 Major Projects · Real Projects Demonstrate Water-based Coating Quality

A Cross-sea Bridge Steel Structure Anti-corrosion Project

C5-I Severe Corrosion Environment
📋 Project Background

The project is located in a coastal area with high salt spray, with a designed service life of 25 years. The total coating area of the bridge steel structure exceeds 300,000㎡.

⚠️ Technical Challenges

The marine atmospheric environment has extremely high salt spray concentration, requiring extremely high corrosion resistance performance for coatings; bridge structures are complex, with many blind spots that require special coating processes; construction schedules are tight, needing to be coordinated with the overall bridge project progress.

🔧 Solutions

Three-layer system: water-based epoxy zinc-rich primer (zinc content > 80%) + water-based epoxy iron-chloride intermediate coat + water-based acrylic polyurethane topcoat. The primer provides cathodic protection, the intermediate coat enhances shielding, and the topcoat offers weather resistance and decorative appeal.

🎯 Project Achievements

All coatings passed 1000-hour neutral salt spray test with adhesion >5MPa. The project was delivered on time, with VOC emissions reduced by over 85% compared to solvent-based solutions.

Project Tags
BridgesC5-I300,000㎡25-year Protection

A large equipment manufacturing plant

C4 Moderate Corrosion Environment
📋 Project Background

New heavy equipment manufacturing plant, with total steel structure weight of approximately 8,000 tons and coating area of about 100,000㎡. Requirements include fast construction speed and compliance with environmental standards.

⚠️ Technical Challenges

The project timeline was tight, and traditional oil-based paints had slow drying times that affected subsequent processes. Local environmental authorities strictly controlled VOC emissions. Some areas of the plant were affected by welding fumes and oil contamination.

🔧 Solutions

The primer used was water-based anti-rust primer (salt spray resistance 120H), and the topcoat was water-based acrylic anti-corrosion topcoat. Welding areas were treated before painting. Airless spraying was used to improve construction efficiency.

🎯 Project Achievements

The construction period was reduced by 30% compared to traditional solutions, with VOC emissions decreased by 85%. The coating adhesion was ≤1 level, and salt spray resistance reached 240 hours, meeting environmental standards. The project passed environmental inspections on the first try.

Project Tags
Factory BuildingC4100,000㎡30% shorter construction period

Anti-corrosion project for power towers in a province

Severe corrosion conditions outdoors
📋 Project Background

Anti-corrosion maintenance project for provincial transmission towers, involving 220kV and 500kV lines, with over 200 towers.

⚠️ Technical Challenges

Towers are located in complex terrains such as mountains and farmland, with difficult construction conditions; the tower structures are complex, with many areas like angle steel and bolts that are hard to coat; the coating is required to require at least 8 years of maintenance-free use.

🔧 Solutions

Special water-based paint for towers is selected, using a 1-coat primer + 2-coats topcoat system. Brush coating is used for gaps in angle steel, while spraying is used for main surfaces.

🎯 Project Achievements

The coating has salt spray resistance >720 hours, adhesion ≤1 level. No blistering, rusting, or powdering after 2 years of field inspection. The owner highly approves of environmental performance and construction convenience.

Project Tags
TowersOver 200 towersSalt spray >720H8 years maintenance-free

Automated production line for motorcycle parts painting

Batch production environment
📋 Project Background

A motorcycle parts manufacturing company, processing 5,000 parts daily, requires coatings with high hardness, good appearance, and suitability for automated production lines.

⚠️ Technical Challenges

High production capacity required (5,000 pieces per day); diverse types of workpieces (aluminum parts, iron parts, ABS parts), with significant differences in substrates; fast-paced painting line, requiring quick drying and stable performance.

🔧 Solutions

Hardware parts are painted with water-based metal baking paint at 120-160°C, while ABS parts are coated with water-based ABS paint. A mixed production line combining automatic electrostatic spraying and robot spraying is used.

🎯 Project Achievements

The coating has zero-level adhesion and hardness >2H. The production line operates smoothly, with a good product rate of >98%. VOC emissions are far below national standards.

Project Tags
Baking paintAutomation5,000 pieces per dayGood product rate >98%

Anti-corrosion project for a petrochemical storage tank area

Chemical storage
📋 Project Background

In petrochemical enterprise storage tank areas, 20 storage tanks of different specifications require internal and external wall anti-corrosion. The storage media include crude oil, finished oil, and chemical raw materials.

⚠️ Technical Challenges

The inner walls of the storage tanks come into contact with oil and chemicals; the coating must be resistant to oil and acids/bases. The outer walls are exposed to chemical atmospheres and must be resistant to chemical corrosion and weather conditions. Some storage tanks cannot be shut down; construction must be carried out while the tanks are in operation.

🔧 Solutions

The inner wall uses a two-component system of water-based epoxy anti-rust primer and water-based epoxy anti-corrosion topcoat; the outer wall is enhanced with water-based acrylic polyurethane topcoat to improve weather resistance. A zoned construction plan is adopted for the operating storage tanks.

🎯 Project Achievements

The coating has salt spray resistance of >850 hours and no abnormalities after 30 days of oil immersion. The project received a safety award from the owner and became a standardized solution for subsequent storage tank anti-corrosion.

Project Tags
Storage Tanks20 unitsEpoxy SystemChemical Resistance

Painting of a Commercial Complex Building

Indoor and Outdoor Buildings
📋 Project Background

Large commercial complex project with a total construction area of approximately 50,000㎡, including shopping malls, office buildings, hotels, and other facilities. High requirements are placed on the environmental friendliness and color effect of the coatings.

⚠️ Technical Challenges

The shopping area has a high foot traffic, requiring environmentally friendly and odorless coatings; the hotel area has high demands for color and texture; different areas have different functions, necessitating differentiated solutions.

🔧 Solutions

The public areas of the shopping mall use high-quality interior wall coatings (no-mess series), while the hotel area uses customized color schemes paired with high-quality interior wall paints. The exterior walls use high-quality exterior wall coatings (weather-resistant). A comprehensive color design scheme is provided.

🎯 Project Achievements

No odor complaints during construction, air quality meets standards after delivery. The exterior wall has withstood 2 years of wind and rain without fading or peeling.

Project Tags
Construction50,000㎡Color customizationEnvironmentally friendly and low odor

More case studies are being updated continuously.

For more detailed project case information or to request a sample, please contact our technical team.

Contact us
WeChat
Foreign trade website
Alibaba store
13349251166
Request a free sample
Online Inquiry
Back to top
13349251166 Free sample request